Steel projects and mining industries

Implementation stages of steel projects and mining industries

– Examining documents and technical drawings of lime-casting-smelting units
– Calculation of the required amount and capacity of the equipment and materials required for each of the units
– Negotiating with vendors supplying the main equipment and accessories of the units
– Deployment of staff, technical and executive personnel
– Supplying installation equipment such as cranes, tools and machines
– Installation of equipment based on the execution and installation sequence that must be followed.
– Pre-commissioning and testing of equipment, cables, etc., in order to prepare the system for no-load tests
-Perform final tests and launch with loads of units and check all items for the suitability of the final product