Project of Medium Pressure Substations (GIS-AIS)

Implementation steps of medium pressure substations project (GIS-AIS)

– Checking documents and technical drawings
– Calculation of the required amount and capacity of the equipment and materials required for the high voltage substation, such as: current transformer, voltage transformer, lightning arrester, line trap, support insulators, tensile insulators, aluminum conductors, tubular conductors, clamps and fittings, ground system, cable , tray and ladder and…
– Negotiating with vendors and providing estimated equipment
– Deployment of staff, technical and executive personnel
– Supplying installation equipment such as cranes, tools and machines
– Installation of equipment based on the execution and installation sequence that must be followed.
– Pre-commissioning and testing of equipment, cables, etc., in order to prepare the system for substation power supply
– Coordinating with regional electricity, dispatching, etc. for the final start-up and electrification of the substation