Power plant projects (electrical and mechanical BOP)

Implementation stages of power plant projects (electrical and mechanical BOP)

– Checking documents and technical drawings
– Calculation of the required amount and capacity of equipment and materials required for utilities and power plant units, such as: high, medium, low pressure cable hubs, ground system, trays and ladders, medium and high pressure panels, battery chargers, diesel generators, transformers, precision instrument equipment and …
– Negotiating with vendors and providing estimated equipment
– Deployment of staff, technical and executive personnel
– Supplying installation equipment such as cranes, tools and machines
– Installation of equipment based on the execution and installation sequence that must be followed.
– Pre-startup and testing of equipment, panels, cables, etc. in order to prepare the system for start-up