CMSUN solar energy projects

Implementation steps of CMSUN solar energy projects

– Reviewing customer requests and needs
– Visiting the installation site in terms of the arrangement of the panels
– Designing and calculating the required capacities based on the needs assessment.
-Supply and build the required equipment
– Installation of equipment based on the execution and installation sequence that must be followed.
– Pre-startup and testing of equipment, panels, cables, etc. in order to prepare the system for start-up
– System startup and more productivity settings